Original language | English |
---|---|
Pages (from-to) | 331 |
Number of pages | 1 |
Journal | Journal of Scheduling |
Volume | 18 |
Issue number | 3 |
DOIs |
|
State | Published - 1 Jun 2015 |
Erratum: Flow shops with WIP and value added costs (J Sched, 13, 3-16, (2010), DOI 10.1007/s10951-009-0130-z)
Jaehwan Yang, Marc E. Posner
Research output: Contribution to journal › Comment/debate
2
Scopus
citations