TY - JOUR
T1 - Preemptive real-time scheduling incorporating security constraint for cyber physical systems
AU - Baek, Hyeongboo
AU - Lee, Jaewoo
AU - Lee, Yongjae
AU - Yoon, Hyunsoo
N1 - Publisher Copyright:
Copyright © 2016 The Institute of Electronics, Information and Communication Engineers.
PY - 2016/8
Y1 - 2016/8
N2 - Since many cyber-physical systems (CPSs) manipulate security-sensitive data, enhancing the quality of security in a CPS is a critical and challenging issue in CPS design. Although there has been a large body of research on securing general purpose PCs, directly applying such techniques to a CPS can compromise the real-time property of CPSs since the timely execution of tasks in a CPS typically relies on real-time scheduling. Recognizing this property, previous works have proposed approaches to add a security constraint to the real-time properties to cope with the information leakage problem that can arise between real-time tasks with different security levels. However, conventional works have mainly focused on non-preemptive scheduling and have suggested a very naive approach for preemptive scheduling, which shows limited analytical capability. In this paper, we present a new preemptive fixed-priority scheduling algorithm incorporating a security constraint, called lowest security-level first (LSF) and its strong schedulability analysis to reduce the potential of information leakage. Our simulation results show that LSF schedulability analysis outperforms state-of-the-art FP analysis when the security constraint has reasonable timing penalties.
AB - Since many cyber-physical systems (CPSs) manipulate security-sensitive data, enhancing the quality of security in a CPS is a critical and challenging issue in CPS design. Although there has been a large body of research on securing general purpose PCs, directly applying such techniques to a CPS can compromise the real-time property of CPSs since the timely execution of tasks in a CPS typically relies on real-time scheduling. Recognizing this property, previous works have proposed approaches to add a security constraint to the real-time properties to cope with the information leakage problem that can arise between real-time tasks with different security levels. However, conventional works have mainly focused on non-preemptive scheduling and have suggested a very naive approach for preemptive scheduling, which shows limited analytical capability. In this paper, we present a new preemptive fixed-priority scheduling algorithm incorporating a security constraint, called lowest security-level first (LSF) and its strong schedulability analysis to reduce the potential of information leakage. Our simulation results show that LSF schedulability analysis outperforms state-of-the-art FP analysis when the security constraint has reasonable timing penalties.
KW - Cyber-physical system
KW - Real-time scheduling
KW - Schedulability analysis
KW - Security
UR - http://www.scopus.com/inward/record.url?scp=84983070601&partnerID=8YFLogxK
U2 - 10.1587/transinf.2015EDP7493
DO - 10.1587/transinf.2015EDP7493
M3 - Article
AN - SCOPUS:84983070601
SN - 0916-8532
VL - E99D
SP - 2121
EP - 2130
JO - IEICE Transactions on Information and Systems
JF - IEICE Transactions on Information and Systems
IS - 8
ER -