AU - Peña-Mora, Feniosky
AU - Han, Sangwon
AU - Lee, Sang Hyun
AU - Park, Moonseo
PY - 2008
Y1 - 2008
N2 - A significant number of large-scale civil infrastructure projects experience cost overruns and schedule delays. To minimize these disastrous consequences, management actions need to be carefully examined at both the strategic and operational levels, as their effectiveness is mainly dependent on how well strategic perspectives and operational details of a project are balanced. However, current construction project management approaches have treated the strategic and operational issues separately, and consequently introduced a potential conflict between strategic and operational analyses. To address this issue, a hybrid simulation model is presented in this paper. This hybrid model combines system dynamics and discrete event simulation which have mainly been utilized to analyze the strategic and operational issues in isolation, respectively. As an application example, a nontypical repetitive earthmoving process is selected and simulated. The simulation results demonstrate that a systematic integration of strategic perspective and operational details is helpful to enhance the process performance by enabling construction managers to identify potential process improvement areas that traditional approaches may miss. Based on the simulation results, it is concluded that the proposed hybrid simulation model has great potential to support both the strategic and operational aspects of construction project management and to ultimately help increase project performance.
AB - A significant number of large-scale civil infrastructure projects experience cost overruns and schedule delays. To minimize these disastrous consequences, management actions need to be carefully examined at both the strategic and operational levels, as their effectiveness is mainly dependent on how well strategic perspectives and operational details of a project are balanced. However, current construction project management approaches have treated the strategic and operational issues separately, and consequently introduced a potential conflict between strategic and operational analyses. To address this issue, a hybrid simulation model is presented in this paper. This hybrid model combines system dynamics and discrete event simulation which have mainly been utilized to analyze the strategic and operational issues in isolation, respectively. As an application example, a nontypical repetitive earthmoving process is selected and simulated. The simulation results demonstrate that a systematic integration of strategic perspective and operational details is helpful to enhance the process performance by enabling construction managers to identify potential process improvement areas that traditional approaches may miss. Based on the simulation results, it is concluded that the proposed hybrid simulation model has great potential to support both the strategic and operational aspects of construction project management and to ultimately help increase project performance.
KW - Construction management
KW - Cost control
KW - Discrete elements
KW - Hybrid methods
KW - Simulation models
UR - http://www.scopus.com/inward/record.url?scp=49749096092&partnerID=8YFLogxK
U2 - 10.1061/(ASCE)0733-9364(2008)134:9(701)
DO - 10.1061/(ASCE)0733-9364(2008)134:9(701)
M3 - Article
AN - SCOPUS:49749096092
SN - 0733-9364
VL - 134
SP - 701
EP - 710
JO - Journal of Construction Engineering and Management - ASCE
JF - Journal of Construction Engineering and Management - ASCE
IS - 9
ER -